residual settlement信息详情
剩余沉降
residual───adj.(数量)剩余的;(物质状态在成因消失后)剩余的,残留的;(实验误差)舍去的,残差的;(土壤)残余的;n.(Residual)(美、阿根廷)瑞斯卓尔(人名);n.剩余物,残渣;残差,剩余误差;(付给表演者的)复播追加酬金;(地质)残丘,蚀余山;(新车购入一定时间后的)转售值
settlement───n.解决,处理;[会计]结算;沉降;殖民
divorce settlement───n.离婚协议书;离婚协议,离婚协议书
settlement account───结算账户;往来账户;清偿帐款
residual definition───残差定义
settlement date───清算日
residual value───剩余价值;残值;残值,剩余价值
residual stress───[力]剩余应力;残余应力
residual calculator───残差计算器
The DM method improves the bearing capacity of the soft soil; and more than 80% consolidation settlement is finished during the construction period, which effectively reduces the residual settlement.───板短桩工法利用施工期的预压完成了80%以上的固结沉降,从而实现减小工后沉降的目的。
Passenger soft land area of embankment design, strength is no longer the controlling factor, the key is to control the residual settlement.───软土地区客运专线路堤设计,强度已不再是控制因素,关键是要控制工后沉降。
settlement and its rate of soft foundation improved by this technology is remarkable during construction, which is beneficial to control residual settlement.───该技术处理软基,施工期间沉降及沉降速率大,有利于工后沉降的控制。
Passenger soft land area of embankment design, strength is no longer the controlling factor, the key is to control the residual settlement.───进行软土地区客运专线路堤设计,强度已不再是控制因素,关键是要控制工后沉降。
Application of rate of settlement to evaluate residual settlement of embankment on soft soil ground───应用沉降速率法计算软土路堤剩余沉降
Simulation of Sheet Deformation About Residual Settlement of Composite Foundation───复合地基工后沉降的薄板变形模拟
Deformation of sheet plate due to residual settlement of pile-net composite foundation───桩-网复合地基工后沉降的薄板理论解
Three Point Calculation Method of Residual Settlement About Pile-Net Composite Foundation───三点法推算桩-网复合路基工后沉降量
It is shown by the tests that, under seismic action, the soft soil presents a gradually increasing residual settlement, while the cohesionless soil shows an abrupt settlement.
The DM method improves the bearing capacity of the soft soil; and more than 80% consolidation settlement is finished during the construction period, which effectively reduces the residual settlement.
Passenger soft land area of embankment design, strength is no longer the controlling factor, the key is to control the residual settlement.
As a result of observation data analysis, we were succeeded in controlling the residual settlement by adjusting the construction time of concrete pavement.
During the pile load-test, if the instantaneous settlement of the pile top is measured, the residual settlement of the pile point can then be determinated.
The settlement and its rate of soft foundation improved by this technology is remarkable during construction, which is beneficial to control residual settlement.
- personal background
- saving water resources
- receiver suppression
- residual share
- queen maid
- savingaccount
- receiver system
- queen make up
- savinggrace
- plating process engineer
- residual shim
- new data
- new dancer
- plating rate
- microvention
- not yourkei
- queen maker
- personal baggage
- queen manager
- parabootchambord
- paraboliccurve