steel column信息详情
钢柱
column───n.纵队,列;专栏;圆柱,柱形物
fluted column───凹槽柱
steel───adj.钢制的;钢铁业的;坚强的;n.(Steel)(德)施特尔;(英)斯蒂尔(人名);n.钢铁;钢制品;坚固;vt.钢化;使冷酷
column chromatography───柱层析(法),柱色谱(法);柱层析法;[分化]柱色谱法
buckling column───屈曲柱
remarks column───[计]备注栏
column heading───[计] 列标题,栏标题;[计]栏标题
in column───编队
rectification column───[化] 精馏塔;[化工]精馏塔
Question and countermeasure presented when being connected with concrete of original under-part and first steel column.───首节钢柱与原下部混凝土柱的连接问题及对策。
The paper introduces CO_2 arc process and equipment for welding the connecting hole joints of thin steel column radiators.───介绍了钢制柱型散热器连接孔薄板内孔CO_2自动焊设备及工艺。
anchorage performance of steel column base of large span structure is one of the key problems in seismic design.───大跨结构柱脚锚固性能是抗震设计的关键之一。
so the fixed column foot is a good choice of structural design, and reinforced concrete cover can be used for protecting steel column foot.───建议工程设计中宜采用刚接柱脚做法,外包混凝土保护层可适当配筋。
Besides, location control of steel column is started from floor basic axis, adjusting elevation and displacement to verticality .───钢柱的定位控制采用从地面基础轴线开始,先调整标高,再调整位移,最后调整垂直度的方法。
Steel column is fixed to special jig, slipping below the installation position by chain block and lifting by pulley block and windlass.───将钢骨柱固定在专用胎架上,通过倒链滑移至安装点下方后,采用滑轮组和卷扬机进行提升就位。
Part of the shop ground should be 1m lower than 0. 000 elevation, steel column feet don't descend, RC column to the base instead.───车间一层地面局部下降1米,钢柱下做钢筋混凝土短柱,柱脚不下沉。
CXZ stainless steel column is mainly for middle-scale pilot production and large-scale production.───CXZ不锈钢层析柱主要做整个系统用于中试及大型生产用。
The steel column has some windings.───钢柱有些弯曲,
The reinforcing structure is suitable for carrying out reinforcement when the intensity of the holding down bolt of the steel column is not enough.
fire-proof painting for steel column ( 2 hours ) and steel beams ( 1.5 hours ) is included.
Alternatively, the seat has a steel column on a lacquered footplate.
One spring morning two anchor bolts were inserted in the footings that were to receive the first steel column.
Besides, location control of steel column is started from floor basic axis, adjusting elevation and displacement to verticality .
H shape steel column and H shape steel team are adopted for the bearing structure.
In installing the steel column, how many mm . Are the deviation range of elevation and perpendicularity?
Steel column is fixed to special jig, slipping below the installation position by chain block and lifting by pulley block and windlass.
Mezzanine structure is make up of steel column, floor beam, meal deck, etc.
- there are two footballs under my desk
- steel columns
- touching on my
- previously boiled water
- touching on the economic front
- there are two kinds of pain
- try to work hard
- sumifs
- sumitomo shi demag plastics machinery gmbh
- table mountain national park
- previously boiled water in ml
- under the streetlight
- so frightened
- previously on the p
- time bargains
- so funny
- try to work out
- sing if you can
- the fun club
- under the stress
- there are two new hotels