steam generator信息详情
[动力]蒸汽发生器;蒸汽锅炉;蒸汽发电机
steam───adj.蒸汽的;n.蒸汽;蒸汽动力;水汽;精力;vi.冒水汽;蒸;用蒸汽动力推动;疾行;<非正式>开始战斗;抢劫
generator───n.发电机;发生器;生产者
dice generator───骰子生成器
leet generator───leet发生器
steam eggs───蒸鸡蛋
foregone steam───放弃的蒸汽
steam bath───n.蒸汽浴; 桑那浴
live steam───流通蒸汽; 新蒸汽;新鲜蒸汽,流通蒸汽
steam fm───蒸汽调频
But this one would be more or less on the primary side, you're losing water from the steam generator.───但是,这个会或多或少是在主面,你不会从蒸汽发生器那失去水。
energy heats up the water, which is piped out to a steam generator.───能量将水加热,然后通过管子输送到蒸汽发生器中。
The primary side, which is the reactor to the steam generator which are in the containment.───第一面,则是反应堆到蒸汽,发生器,那是在容器里面的。
This energy heats oil flowing through the pipe, and the heat energy is then used to generate electricity in a conventional steam generator.───这能源热涂油水于流动过管,而且热能源然后用来在一个传统的蒸气产生器中产生电力。
The heat is then used to turn a steam generator to generate electricity in a central plant.───然后,这种热能把曾经的蒸汽发电转成工厂中心的发电。
And we have our steam generator as you know and the feed from the turbine goes in and the steam comes out.───我们有蒸汽发生器,如你们所知,在涡轮里产生,进入,然后,蒸汽就出来了。
When needed, the heat is pumped into a steam generator which sends electricity to the central Californiangrid.───在需要时,热的熔体用泵输送到蒸汽发电机,它把电力送往加利福尼亚州的中心电网。
Now we then have to condense that steam and recirculate it back either to a steam generator or back to the core.───现在,我们需要压缩蒸气,将它流通回去,或者到一个蒸气发电机,或回到核心。
electron metallographic analysis of cracks of a certain steam generator tube was made by electron microscope.───用电子显微镜对该蒸汽发生器传热管管束裂纹进行断口电子金相分析。
Additionally, steam generator design requirement of ALWR - URD are introduced.
The model simulates sodium flow in the steam generator as quasi-continuum. The model uses volume porosity, area permeability and distributed resistance to model the tubes and support plates.
Also disclosed is a superheated steam generator using a flow-through heater.
The once-through steam generator with double-side heat transfer component was presented in this paper. And the component is composed of straight tube outside and helix tube inside.
Additionally, steam generator design requirement ALWR - URD are introduced.
A metal tube split open in the steam generator of the nuclear power plant.
This paper focuses on the optimal pitch arrangement in double-side heating once-through steam generator with helix tube inside.
On the basis of CWS(Coal-water Slurry) combustion theory, The dissertation focuses on experiment and CFD calculation about combustion, ash deposition and field application on steam generator.
The nuclear unit was a primary steam generator with an oil-fired secondary superheater.
- try this book
- sad wen jie
- pushing aside
- robert greene
- pushing away
- sulfurization
- she has a big farm
- touch phone
- ta lishen
- telencephalons
- touch photo
- speed skate rink
- the former world champion
- so charming
- preventability
- she has a big head
- she has a big heart
- relief feeling
- under retail
- sulfurize
- robert hale