speed railway信息详情
高速铁路
railway───vi.乘火车旅行;n.(英)铁路;轨道;铁道部门
intercity railway───n.城际铁路
speed───v.快速运动;加速;促进;(使)繁荣;超速驾驶;(非正式)用兴奋剂成瘾;n.(Speed)斯皮德(人名);n.速度,速率;进度;迅速;繁荣;感光度;排挡;(非正式)安非他明
railway bridge───铁路桥;铁桥;火车桥
railway age───铁路时代
railway empire───铁路帝国
trillium railway───延龄草铁路
railway guns───铁路炮
railway museum───铁路博物馆
How long does it take the man to get to Huaihua High-speed Railway Station?───到怀化高铁站需要多长时间?
It will take them about five years to build the high speed railway.───他们将花费大约五年的时间来建造这条高速铁路。
The government is expected to reject the idea of state subsidy for a new high-speed railway.───预期该政府不会同意向一条新建高速铁路提供国家补助的意见。
The next day, four high-speed railway lines out of Paris were found to have been sabotaged.───第二天,巴黎四条高速铁路线被发现遭到破坏。
The British government is expected to reject the idea of a state subsidy for a new high-speed railway.───人们预计英国政府不会接受由国家补贴修建新的高速铁路的意见。
Therefore, research on the train running plan of Beijing-Shanghai High Speed Railway is of great theoretical and practical significance.───因此,本文对京沪高速铁路列车开行方案的研究具有十分重要的理论意义和实践意义。
Changzhou City in east China's Jiangsu Province was luckily chosen to be one of the stations on the Beijing-Shanghai High-Speed Railway.───中国东部的江苏省常州市很幸运被选为京沪高铁的一个站点。
As to run one of the most important factors in a high-speed railway, the power supply system must be an absolute security and stability.───作为高速铁路运行中最重要因素之一的供电系统就必须绝对安全稳定。
the airport at ota, together with a high speed railway, is the main infrastructure development project planned by the portuguese government.───ota机场及一个高速铁路是葡萄牙政府目前的两个主要基础设施发展项目。
Take the high - speed railway now strung across the nation.
After the analysis of the operation cost characteristics and composing in high speed railway, the methods and means of activity-based costing of operation cost account were put forward.
Setting section crossover in high - speed railway is subject to many factors.
Transportation is the third revolution of railway construction, big load of high speed railway.
2013 is the high- speed railway equipment industry growth in the 5 - year, high- speed and heavy -duty rolling stock procurement is the key word.
Operation cost account is a critical aspect of high speed railway construction and its economy benefit evaluation.
The British government is expected to reject the idea of state subsidy for a new high speed railway.
Therefore, research on the train running plan of Beijing-Shanghai High Speed Railway is of great theoretical and practical significance.
Mainly introduces the technical parameters and running conditions of locomotive crew in China's high speed railway, puts forward absorbing foreign railway locomotive maintenance into system.
- reliance retail
- rawlinson
- under plate
- prevalence of diabetes
- prevailingprice
- touch my ears
- roasting technique
- she goes swimming everyday
- the forces of global engagement
- sad meteor
- ta ang oppa
- pushed ahead
- she goes swimming every week
- tim tales
- touch my face
- there are five books on the desk
- sad movie makes me cry
- sulfoxides
- under plant
- reliance steel aluminum
- sulfur acid