specific cost信息详情

specific cost发音

意思翻译

[会计]特定成本

相似词语短语

specific───n.特性;细节;特效药;adj.特殊的,特定的;明确的;详细的;[药]具有特效的

specific resistance───[电]比电阻;电阻系数;比电阻,电阻率,电阻系数

specific way───具体方式;特定方式

specific issues───具体问题;特定问题

specific gravity───[物]比重

specific targets───具体目标

specific goals───具体的目标;明确的目标

specific target───具体任务

specific issue───具体问题;特定问题

双语使用场景

paper, taking the construction drainage of a certain tunnel for example, conducts a specific cost analysis on the same.───此文以某线某隧道的施工排水为例,进行具体的费用分析。

carbon tax would set a specific cost per unit of carbon dioxide, thus establishing a clear cost for carbon.───碳排放税将为每单位二氧化碳设置一个具体的成本,并因此为碳确定一个清晰的成本。

cost price of bidding should be the specific cost of the corporation.───招标法指的成本价应该是企业个别成本。

Use the Identity parameter to specify the name or GUID of the IP site link for which you want to set an Exchange-specific cost.───使用Identity参数可以指定要为其设置特定于Exchange的开销的IP站点链接名称或GUID。

In the formal hospital after a medical examination conditions, to determine the specific cost of treatment of redundant prepuce.───在正规医院经过医生检查病情后,才能确定治疗包皮过长的具体的费用。

Finally, on the base of compiling construction budget, project cost plan is further made and specific cost management work is carried on.───最后在施工预算编制的基础上,进一步编制项目的成本计划,进行具体的项目成本管理执行工作。

You can also add specific cost fields to any sheet view by inserting a cost column.───也可通过插入成本列,在任意工作表视图中添加特定的成本域。

A carbon tax would set a specific cost per unit of carbon dioxide, thus establishing a clear cost for carbon.───碳排放税将为每单位二氧化碳设置一个具体的成本,并因此为碳确定一个清晰的成本。

Use the ExchangeCost parameter to assign an Exchange-specific cost to the IP site link.───使用ExchangeCost参数可以为IP站点链接分配特定于Exchange的开销。

英语使用场景

The architectural study by Hellmuth-Obata-Kassabaum would be used by construction managers to develop a more specific cost estimate by spring.

Specific cost can be figured out according to specific circumstances, for example, the number of buildings to be erected on an island.

A carbon tax would set a specific cost per unit of carbon dioxide, thus establishing a clear cost for carbon.

The specific cost flow of a job order costing system shows in Figure 14 - 2 as fol 1 owing.

The cost price of bidding should be the specific cost of the corporation.

This paper, taking the construction drainage of a certain tunnel for example, conducts a specific cost analysis on the same.

The r 2 measure helps analysts determine how much confidence to put in specific cost predications.

Besides these also a primary investigation on the capital investment and specific cost of output water is discussed.