secondary load信息详情

secondary load发音

意思翻译

二次负载

相似词语短语

secondary───n.副手;代理人;adj.第二的;中等的;次要的;中级的

load───vi.[力]加载;装载;装货;vt.使担负;装填;n.负载,负荷;工作量;装载量

secondary consumer───次级消费者

secondary education───中等教育

secondary color───次生色;n.合成色,间色;二次色

secondary school───n.中学;中等学校

secondary products───次级产品;副产品

secondary consideration───次要考虑

secondary succession───[植]次级演替;次生演替系列

双语使用场景

Secondary load impedance of a current transformer(CT) has great influence on the error of the CT.───电流互感器二次负载阻抗对电流互感器误差有较大的影响。

The results show that the effect of secondary load can be neglected if initial load is less than 20% of ultimate capacity.───研究结果表明,在初始荷载小于极限承载力20%的情况下,可以忽略二次受力的影响。

Because power systems are complex and multi-variable, it is very difficult to realize automatic secondary load-frequency control.───电力系统一般都很复杂且变量又多,实现二阶负载—频率自动控制也相应变得很困难。

In this paper, the bending responses of RC beams strengthened with ferrocement considering secondary load were experimentally investigated.───本文对用钢丝网复合砂浆薄层加固的二次受力钢筋混凝土梁进行了正截面受弯试验研究。

Ever does not satisfy to own translation, each secondary load new proofreading all can the school have problems.───对自己的翻译从不满足,每一次重新校对都能校出问题。

In this paper, the death cell of ANSYS is used to simulate the secondary load.───本文利用ANSYS中的生死单元对二次受力情况进行了模拟。

reinforced concrete beams; reinforcement; CFRP; secondary load; non linear finite element analysis; deflection; ultimate load; yield load;───钢筋混凝土梁;加固;碳纤维布;二次受力;非线性有限元浅析浅析;挠度;极限荷载;屈服荷载;

Bending Bearing Capacity of Concrete Beam Strengthened by Adding Tensile Reinforcements Taking into Account the Secondary Load───增补受拉钢筋加固砼梁二次受力时的抗弯承载力

Calculation method for bending capacity of FRP bars NSM reinforced concrete members considering effect of secondary load───FRP筋NSM加固混凝土构件二次受力时抗弯承载力计算方法

英语使用场景

The results show that the effect of secondary load can be neglected if initial load is less than 20% of ultimate capacity.

When the initial load is big, the secondary load could influence the performances of CFRP reinforcement on all aspects as mentioned above.

The generator neutral point of Hubei Tiantang Pump-storage Power Station adopts the earthing scheme through distribution voltage transformer with secondary load resistance.

Secondary load impedance of a current transformer(CT) has great influence on the error of the CT.