hydropower信息详情
n.水力发出的电力;水力发电
hydropower plants───水电站(hydropowerplant的复数);水电站(hydropower plant的复数)
Backup power could also be provided by linking wind farms with a solar cell, with conventional or pumped-storage hydropower, or with efficient natural-gas-burning turbines.───将风力发电厂与太阳能电池、常规或抽水蓄能的水电或高效的天然气涡轮机连接起来,也可以提供备用电力。
Even hydropower has its own problems.───水电也有它自身的问题。
If we had listened to them, this hydropower station would never have been built.───当初要是依了他们的主张,今天就不可能有这个水电站。
China says it has exploited just a third of its total hydropower reserves, compared to more than 80 percent in the United States and Japan.───中国表示,这还仅仅只利用了其三分之一的水能总量,与美国和日本80%的发开量是有差距的。
Just how much a hydropower boom will help is uncertain.───但水电的繁荣可以给它带来多大的帮助仍然是个未知数。
However, the model is applicable to any hydropower generator and the principles can be applied across the power generating industry.───然而,模型适用于,任何的水力产生器和原则能在整个产生工业的力量被应用。
The environmental impacts of a basin hydropower development are different from that of an isolated individual hydroelectric project.───流域水电梯级开发所产生的环境影响不同于单个的水电工程;
The percentage of coal consumption dropped, all the others increased, the biggest rise took place in hydropower & nuclear power.───煤炭比重下降,其他均上升,水电和核电增长幅度最大。
And a big hydropower plant at the nearby Kajaki dam should be able to light up Kandahar for a fraction of the cost.───此外,花费小部分资金,就能在附近的Kajaki大坝修建一座巨大的水利发电厂,照亮整个坎大哈。
The hydropower station dispatching factors can be looked up in the Control Rule Table and the affiliation of each factor to the fuzzy subset is determined so as to get the dispatching decision.
Three-dimensional finite element model of Lijiaxia Hydropower Station is established to monitor operation condition of the arch dam.
The turbine ring gate of Guangzhao Hydropower Station was first ring gate which was designed and manufactured by Harbin Electric Machinery Company Limited.
Small-scale hydropower projects and electricity generated from waste make up the majority of the schemes which have received approval.
In the dam site of Wuqiangxi Hydropower Station, there is a high side - slope in left bank.
Since Gongzui Hydropower Station put into operation, the tail water level always threaten the flood control safety against pow er-house(in di cating powerhouse on the ground).
Transformation of electromechanical device of Danjiangkou Hydropower station has already been implemented.
So it is meaningful to research on hydropower investment project risk evaluation and index system.
The hydropower station " economical operation involves space optimization and time - space optimization. "