schedule control信息详情

schedule control发音

意思翻译

进度控制;工程管理;预定输出控制

相似词语短语

schedule───v.安排,预定;将……列入计划表或清单;把(建筑物)列为文物保护单位;n.计划(表);时间表;一览表;(电视或广播)节目表;课程表;报税单;附件(尤指表格、单据等)

of schedule───时间表

agglomeration schedule───结块时间表

control───v.指挥; 控制; 限定; 限制; 阻止蔓延; 抑制;n.统治; 控制(力); 克制; 管理; 限制; 控制按钮; 检查站/人员; 对照标准;n.控制;管理;抑制;操纵装置;vt.控制;管理;抑制

boxing schedule───装箱时间表

demand schedule───需求一览表;需求计划;(市场)需求表

touring schedule───巡回演出时间表

spike schedule───高峰时段

schedule 1───附表1

双语使用场景

Project development plan, and the project execution schedule control and management.───项目开发计划,并对项目执行进度进行控制、管理。

Schedule control-controlling changes to the project schedule.───进度控制——控制项目进度的变更。

Responsible for project cost and schedule control.───负责项目成本和进度控制。

Plan and schedule control, cost control, quality control and safety control are important parts of project management.───计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。

Specific details for wind power equipment supervision and basic measures for the schedule control are respectively given.───提出了监造工作的内容及设备制造进度控制的基本对策。

Have experience in Design, Procurement or Construction Management and familiar with Cost, Quality, Schedule Control.───具有设计,采购或施工管理经验并熟悉费用控制、质量控制和进度控制。

Participate engineering schedule control, track each specialty of mechanical, electric and instrument construction according to schedule.───参与工程进度管制,跟踪督促机、电、仪等各专业按计划进度施工。

Combination of quality and schedule control, minimize the cost of the project life cycle. 7.───结合质量及工期制约投资,追求项目全生命周期的费用最小。

And the application of schedule control, deviation analysis and earned value in construction project are discussed.───阐述了时间进度法、偏差分析法及挣值法在施工过程中进行成本控制的运用;

英语使用场景

Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.

Finally, in the previous research foundation, this paper has put forward specific schedule control programs and measures in use of the schedule control methods and tools.

This paper describes the schedule control, profit control and quality control of the project in the construction of internationally contracted engineering.

As one of the advanced project management methods, Earned Value Management is originated in the early 20th century. Firstly, it was brought into the cost schedule control system standard by the U. S.

Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.