reservoir engineering信息详情

reservoir engineering发音

意思翻译

油藏工程

相似词语短语

reservoir───n.水库;蓄水池

beaverdam reservoir───beaverdam水库

stagecoach reservoir───驿站马车水库

reservoir host───储存宿主,贮存宿主;储存宿主,存储宿主,贮存宿主

blacktail reservoir───黑尾水库

angostura reservoir───[地名] [美国] 安戈斯图拉水库

reservoir rock───n.[岩]储集岩;贮油岩;储油岩石

verus engineering───维鲁斯工程公司

engineering works───工程建筑物;机器制造厂

双语使用场景

steady testing is an important tool for evaluating productivity of oil well in petroleum reservoir engineering.───在油藏工程中,对于评价油井产能,稳定试井是一个重要的工具。

Comprehensive evaluation of reservoir is an important studying content for reservoir engineering and development of oilfield.───油藏综合评价是油藏工程和油田开发的重要研究内容之一。

Material balance equation of gas reservoir is an important method in gas reservoir engineering.───气藏物质平衡方程序,是气藏工程中的重要方法。

Case studies indicate the correctness and practicability of these equations which can be used in reservoir engineering study and prediction.───用较多的实例证实了递减率微分方程与相公式的正确性与实用性,这些公式可用于油气藏工程研究与预测。

Secondly, application of the Non-Darcy porous flow theory in reservoir engineering is analyzed.───其次,对非达西稳态渗流理论在油藏工程中的应用做了分析。

Reservoir engineering is the "art of development and production for high-economic recovery from reservoir. "───油藏工程是高度经济地从储层中采出油气的一门开发和开采的艺术。

Rational well spacing density is optimized through reservoir engineering and economic method.───利用油藏工程方法和经济法优选合理井网密度;

This can supply basis for reservoir engineering design of the horizontal wells in gas cap reservoir.───该研究结果为气顶油藏水平井的油藏工程设计提供了依据。

英语使用场景

Expone nt ial decline is an important forecasting method in gas reservoir engineering.

According to the basic concept of water-consumption and the reservoir engineering method, we derivate the method of making water -consumption chart.

Cash flow method is used to make projection on productivity, investment and production cost as per the parameters offered by reservoir engineering and surface engineering and calculate reserves value.

And the study of bottom water reservoir engineering is to determine the development of horizontal wells to optimize production systems, improve the ultimate recovery purposes.

Methods Reservoir engineering calculation, numerical simulation, examination and field test were adopted to define development strategy.