period of construction信息详情

period of construction发音

意思翻译

建设期

相似词语短语

period of───期间

construction───n.建设;建筑物;解释;造句

phases of construction───施工阶段

a period of───一个……时期;一段……时间;阵子

the period of───……时期

period───n.周期,期间;时期;一段时间;经期;课时;句点,句号;adj.某一时代的

period of time───一段时间;时段;n.时段,一段时间

cerium period───铈周期

trial period───受审期,试用期

双语使用场景

Tunnel surrounding rock deformation monitor is an important method for holding information of surrounding rock and controlling tunnel stability in the period of construction.───隧道施工过程中的围岩变形监测是掌握围岩的动态信息、确保施工期间隧道稳定性的重要手段。

During the period of construction, it is essential not only the right sense of quality but also the management with scientific control technology in the whole process.───施工期间,除了要树立正确的质量意识外,还要应用科学的控制技术对施工全过程进行管理。

During the period of construction, the construction unit shall assign special persons to take charge of sanitation and anti-epidemic work at the construction site.───施工期间,建设单位应当设专人负责工地上的卫生防疫工作。

During the period of construction, be responsible for the quality of the equipment installation.───在建设期内,对设备的安装质量和合理性负有责任。

Then we discuss the problem during the problem during the period of construction and development and give some pertinent suggestions.───讨论了地质公园建设、开发过程中所存在的问题并提出相关措施和建议。

After ten-year period of construction, a modern and open coastal city will be put up near the coast of the East Sea.───再经过十几年的建设,一座现代化开放的海滨城市将屹立东海之滨。

Engineering changes is related in whole life period of engineering design, and mostly in the period of construction .───工程变更涉及项目的整个生命周期,主要发生在实施阶段。

We're not supposed to retain a drop, and [even] during a stated period of construction, inflow is equal to outflow.───他说“我们不应该截流哪怕一滴水,即使在规定的施工期间,流进的水量和流出的水量也是相等的。”

A serious shortage of this philosophy, approach and methods can not meet the new period of construction enterprise development requirements.───这种理念与方式、方法的欠缺与严重不足,已不能适应新时期对建筑施工企业的发展要求。

英语使用场景

Yet during the period of construction overseen by Brunelleschi only three men died in work-related accidents.

During this period of construction, the human character is revised and changed until at maturity a fairly well-fixed form of character is found.

The maximal flow—minimal cut theory was explained in the paper. A period of construction—cost optimization about a factual project was analysed.