material control信息详情

material control发音

意思翻译

材料控制

相似词语短语

material───n.材料;用具;(有指明特征的)人才;素材;曲目;布料;adj.物质的;身体需要的;和推理内容有关的;重要的;(证据或事实)决定性的;客观存在的;物欲的;n.(Material)(意、美)妈特力娅丽(人名)

control───v.指挥; 控制; 限定; 限制; 阻止蔓延; 抑制;n.统治; 控制(力); 克制; 管理; 限制; 控制按钮; 检查站/人员; 对照标准;n.控制;管理;抑制;操纵装置;vt.控制;管理;抑制

instructional material───教材

reading material───阅读材料; 读物;阅读材料;[图情]读物

material arts───物质性艺术

material handler───仓库管理员;物料管理员

phosphorescent material───发磷光物质

waste material───[环境]废物;[材]废料;[经] 废料; 废物

belting material───皮带衬料

双语使用场景

Included incoming material control, process control, random product inspection & continuous improvement.───包括来料控制,生产控制,产品检查& 持续改善管理。

Ability of supervisory skills and continuous Improvement. Material control and cycle count.───具备团队领导的能力,具持续改善意识,物料控制,生产周期控制。

Are the material control records maintained per the procedures defined?───是否根据程序要求对物料的管制记录进行保存。

The establishment of the subsidiary companies will expand the paper supply channels, thereby enhancing the company's raw material control.───该附属公司的成立将扩大纸张供应渠道,从而提高公司的原材料控制。

To be responsible for the indirect production material control, total cost control , To control and maintain the stationery for shop floor.───负责非原料性材料的控制,总成本控制,控制和保证车间文具用。

To make a inventory for all materials before store, familiar with overall operation flow of store and material control.───物料入库盘点,熟悉仓库或物控整体运作流程。

Submit purchase plan of non-production material, control the least inventory of material and meet the production requirement.───负责提出非生产性物料的采购计划,保证物料的最底库存和满足生产的需要。

Experienced on inquiry, bid evaluation, expediting, inspection management, logistics, site material control etc.───具有采购询价、投标评估、催交、检验管理、物流及现场材料控制相关经验;

Support supplier to implement tracking process at supplier sites, Implement for Nonconformance Material Control and Review.───协助供应商实施可追溯性管理;异常材料管控和确认;

英语使用场景

Good knowledge in material control.

Strict material control tries to avoid color difference after the finished products are painted because of raw material difference.

Does the material control work.

Material Control Commissioner engaged in the work.

All of the casting dimension precision, surface roughness and material control have reached national standard.

Maintains history records on incoming material control.

The key technology of stratospheric airship photoelectric telescope deal with material, control technology, energy sources, high-energy physics, optics, etc.

Material control and cycle count.

Familiar with MRP system and material control plan, strong analysis ablity and communication ablity and English.