pile head信息详情
[建]桩头
pile───n.(Pile)人名;(西)皮莱;(英)派尔;n.堆;大量;建筑群;vi.挤;堆积;积累;vt.累积;打桩于
voltaic pile───[电]伏打电堆
pile on───堆在…之上;使堆积在…;(使)堆积, (使)蜂拥
untidy pile───乱堆
pile up───积累,堆放起来;堆放,堆积; 积聚; 成堆
compost pile───堆肥
culm pile───秆堆
pile out───走出;挤出;成群离去,蜂拥而出
garbage pile───垃圾堆
Transient lateral response of pile subjected to lateral impulse load at the pile head is studied.───研究了桩顶受到横向冲击荷载时桩的瞬态横向动力响应。
Static loading test, which is expensive, is usually required for getting pile head stiffness.───为了确定桩的刚度,通常需要通过静载荷试验测取,耗资巨大。
the effect of pile head vertical load value on negative skin friction is analyzed.───桩顶荷载大小的影响进行了研究。
The pile head under load and the soil around the pile are produced on the basis of friction piles while load covered in the pre-field case.───同时在预制场满布荷载的情况下,桩顶承受荷载,桩基础周围土体均对桩基础产生了摩阻力。
The pile head condition plays an important role in the distributions of the displacement and the bending moment along the pile shaft.───桩顶的约束条件对位移和弯矩沿桩身的分布影响很大;
The anchor pile support apparatus for pneumatic caisson includes bearing block, jack, steel bracket, anchor pile and expanded pile head.───本发明公开了一种气压沉箱锚桩支承装置,包括垫块、千斤顶,钢托架,锚桩,桩顶扩大头。
The boundary condition at the pile head plays an important role in pile responses.───桩顶约束条件对桩的响应影响很大。
Shear failure in pile head Fig. 4 Fig.───图4日本神户地震中桩顶剪切破坏
On construction technique of shaping cast-in-place bored pile head at a time───锅锥成孔灌注桩桩头一次成型施工工艺
In the current harbour code, the formula of pile head stiffness is based on experience, and the error of the code value, compared with the measured value, is remarkable.
The anchor pile support apparatus for pneumatic caisson includes bearing block, jack, steel bracket, anchor pile and expanded pile head.