l c b信息详情
abbr.线路控制块(LineControlBlock);下部偏中弓形失真
b b c───abbr.英国广播公司(BritishBroadcastingCorporation)
b c───abbr.公元前(BeforeChrist)
C B C───abbr.加拿大广播公司(CanadianBroadcastingCorporation)
B L───abbr.法学士(BachelorofLaw);架桥装置(Bridge-Layer);提货单(billoflading);[法]提单
l b───abbr.救生船(Lifeboat)
l l c───abbr.液面控制(LiquidLevelControl);有限责任企业(LimitedLiabilityCompany)
i c b c───abbr.中国工商银行(IndustrialandCommercialBankofChina)
l c───abbr.登陆艇(LandingCraft);全套发射设备(LanchComplex);发射控制(LaunchControl);国会图书馆(LibraryofCongress)
Z B C───Z B C公司
Party A shall bear the interest on the usance L/C and the down payment of Party B.───甲方负担远期信用证及乙方预付款的利息。
Method Portal hypertension was induced by portal vein stenosis(PVS) in 30 rats subdividing into 3 groups:group B (Model), group C in which L arginine was given, and group D receiving L NAME.───方法采用门静脉部分缩窄(PVS)制成门静脉高压模型的30只大鼠被均分为3组:模型组(B)、左旋精氨酸组(C)、单甲基精氨酸组(D)。
The latest shipping date of Party B must be 20days after Party A issuing the irrevocable documentary L/C at sight but within the latest shipping date stipulated in the《Purchase Sheet》.───乙方的交货期限为甲方向乙方开具不可撤消即期跟单信用证20日后且在《购货清单》中载明的交货期限内。