spillway信息详情
n.溢洪道;泄洪道
bell-mouth spillway───喇叭口溢洪道
bell-mouth spillway death───喇叭口溢洪道死亡
bell-mouth spillway inside───喇叭口内溢洪道
bell-mouth stone spillway───喇叭口石溢洪道
In early July 2010, the lake finally began flowing over the spillway.───月初,堰塞湖终于通过泄洪渠开始放水。
over the spillway appears white, likely resulting from its rapid flow.───泄洪渠上的水流呈现出白色,估计是快速流动的关系。
The dam builders underestimate the risk of spillway failure.───水坝工程师低估了泄洪道失控的风险。
Engineers and army laborers worked furiously on a spillway to relieve the growing lake, which had backed up past several settlements.───一支由工程师和军队劳工组成的队伍争分夺秒开凿出一条泄洪渠以减轻日益剧增的湖泊的压力,这支队伍曾经加固过不少定居点。
This technique is particularly effective where a riffle drops into a pool or at the dis-charge of a spillway or penstock.───当浅滩掉进水中深穴或在溢洪道和闸门之出水口,这种技巧特别有效。
The stepped spillway is interested by engineers due to its excellent function of energy dissipation and aerification .───台阶式溢洪道因其显著的消能、掺气效果而倍受工程界的关注。
Many spillway and stilling basins have required extensive repair, even though the vast majority has never been subjected to design flows.───很多溢洪道和消能池已经需要大修了,尽管绝大多数的从来没有遭遇设计(洪水)流量。
Completion of the spillway was expected to reduce the risk of such a catastrophic event.───预计泄洪渠的完成能够降低发生这种灾难性事件的风险。
One of the spillway gantries was slightly damaged. However, all gates could be opened after the shaking.───一个泄水口的龙门吊受到轻微破坏,所有闸门在震后都可以开闸放水。
Stepped spillways is a type of new spillway structure.
The stepped spillway is interested by engineers due to its excellent function of energy dissipation aerification.
The stepped spillway is interested by engineers due to its excellent function of energy dissipation and aerification .
The project comprises construction of a rockfill dam, spillway system, intake structure, headrace tunnel, surge shaft[sentencedict.com], Read More ?
A certain reservoir dam spillway slope stability and affect the normal operation of the reservoir storage key projects.
Dongfeng hydropower station is open ski spillway.
The section size of the tunnel spillway of is 14.
The velocities over the spillway buckets of three roughness surfaces and two radius are measured by LDV in the National Key Laboratory of the Hydraulics for the High-velocity of CUST.
If there is heavy rain, the spillways must be enlarged to allow the floodwater to escape before the dam bursts.