riprap信息详情
vt.用乱石筑基
n.乱石;堆成的石基
sales manager job description───销售经理职位描述
trip switch───[电]跳闸开关,跳脱开关;转辙器,拨叉
weather stripping───n.挡风雨条
description of adhd───adhd的描述
overripe banana───过熟香蕉
unscriptural prayers───无剧本的祈祷
school trip───郊游;学校组织的旅行
inhabited trip───有人居住的旅行
manuscript transcription───手稿抄写
strip off───脱衣;脱去;剥落;去掉[剥去]某物的表皮; <非正>揭开(伪装); 脱掉(衣服); 劈
Common problems and their solutions are put forward in riprap-filled sea formation during bored pile execution.───提出了在抛石填海地层钻孔灌注桩施工中常见问题及处理方法。
Use gabion wall system, terraces, riprap, and less concrete to protect the riverbank.───利用石笼墙系统、阶梯、抛石和少量的混凝土保护河岸。
calculation results of scour depth and stabilization of riprap are consistent with the actual situation.───冲深与抛石稳定性的计算与实际工程的结果较为一致。
Riprap embankment is one of general coastal projects, and explosive compaction is used in foundation treatment of soft soils.───抛石海堤在海岸堤坝工程中十分常见,而对存在淤泥的地质进行填筑时常使用爆破挤淤法对基底进行地基处理。
Riprap-- Boulders or loose stones placed in a hollowed out culvert area protect soil underneath from erosion, while slowing water flow.───抛石-大石或放置在松散石头掏空涵洞区保护土壤免受侵蚀下,同时减缓水流。
If I know shad are spawning on docks or riprap, I fish as many as I can in that short window.───如果我知道鲱鱼在小码头(泊位)或者石头堆产卵,我就会尽可能多的做钓那一部分有效的标点。
Taking a project in Qingdao as an example, this paper introduces the design of process comparison in water riprap shipment.───以青岛某工程为例,介绍水抛石装船工艺比较设计。
Technique for reinforcement of the underwater riprap of gravity-type piers and researches on its effectiveness detection───重力式码头水下抛石体加固技术及检测研究
Anti-seepage treatment of dumped riprap levee foundation by borehole grouting in harnessing the main stream of the Haihe River───海河干流治理工程抛石堤基钻孔灌浆防渗处理
Formulas of the displacement of riprap are derived from the elliptic velocity formula.
The area of riprap protection, protective revetments and silt arrester projects shall be defined in accordance with the approved design documents.
Anti-seepage treatment in riprap layer has always been a hard problem to engineers and technicians.
Construction measures and quality control methods of underwater riprap protection of bank are provided, and a practical example is given.
Water picked up riprap off the bottom in front, and rammed it through to the tail bed.
Riprap protection of bank was applied in the middle and lower Yangtze River and many other rivers at home and abroad.
A formula reflecting the stabilization of riprap in a closure work and of groyne head apron is thus deduced.
They riprapped the dykes of the reservoir with stone.
The riprap included derrick stones, and each stone weighed seven tons.