punner信息详情
n.夯,夯具
upper part of shovel plough is provided with a ground break punner with length matched with the shovel plough.───的犁铲上部设 有长度与犁铲匹配的破土夯;
Analyzing on-site test data, the author provides strong punner construction parameters proper for this project, and concludes and analyzes problems happened in construction.───通过对现场试验资料的分析,提出了适合该工程的强夯施工参数,并对施工中出现的现象进行了总结和分析。
The upper part of shovel plough is provided with a ground break punner with length matched with the shovel plough.───所述的犁铲上部设有长度与犁铲匹配的破土夯;
Discussion on the Clearance between the Punner and Runner Chamber of A water Turbine───水轮机转轮与转轮室间隙探讨
Application of Punner-pipe Curtain Construction Protection Scheme in Underground Engineering───夯管帷幕法施工防护方案在地下工程中的应用
Application of the Strong Punner Method in Treatment of Liquefied Foundation of Expressway───强夯法在处理高速公路液化地基中的应用
Application of Punner-Enlarging Piles to a Tall Building in Wuhan───夯扩桩在武汉地区高层建筑中的应用
Study and Application of Composite-carrier Punner-enlarging Pile───复合载体夯扩桩的应用研究
Drum machine changes would result in a null at the punner in an intermediate state.
The upper part of shovel plough is provided with a ground break punner with length matched with the shovel plough.
Analyzing on-site test data, the author provides strong punner construction parameters proper for this project, and concludes and analyzes problems happened in construction.