ground test信息详情
静态试验;地面测试
ground───n.地面;土地;范围;战场;根据;vt.使接触地面;打基础;使搁浅;v.研磨(grind的过去分词);压迫;adj.土地的;地面上的;磨碎的;磨过的;vi.着陆;搁浅
crimination ground───犯罪现场
ground substance───[细胞]基质
ground water───n.地下水,基础; 潜水;[地质][水文]地下水
play ground───游戏场;运动场;体育场;体育场,运动场,游戏场
new ground───n.新开发之农地
thrashing ground───打谷场
ground color───基色;底色
open ground───露地;开阔地,露天地
Calculations were performed on a "320" digital computer, and model tests on a ground test facility.───计算是在数字计算机“320”上完成的,并在地面设备上做了模型实验。
The ground test replacement screw drill.───地面测试更换螺杆钻。
research of equipment on airplane need ground test equipment which have maturity functions.───机载电子设备的研制和开发,需要功能完备的地面检测设备。
This paper discusses the airworthiness certification flight test of a propeller, consisting of the ground test and the flight test.───介绍了某型螺旋桨适航审定试验,包括装机地面试验和飞行试验。
It was applied to the main clutch control of a tracked vehicle, and proving ground test was carried out.───将该控制策略应用于某履带车辆的主离合器控制,并进行了实车试验。
COAL MINE EQUIPMENT. FLAME RETARDATION CONVEYOR BELTS WITH STEEL CORD FOR UNDERGROUND AND FOR ABOVE GROUND. TEST METHODS AND MEASUREMENTS.───煤矿器材.井下和井上金属帘线胎体防火焰输送带.试验和测量方法
To meet the needs of certain type of aircraft avionic system ground test, a set of air data computer stimulating system was designed.───针对某型飞机航电系统地面试验的需要,设计了一套大气数据计算机激励器系统。
It is an important and basic issue to choose monitoring parameters of Liquid propellant Rocket Engine(LRE) monitoring system in ground test.───确定监测参数是液体火箭发动机地面试验监控系统的一个重要而基础的问题。
Especially. the firing logie of the small disturb- ante with the ground test.───特别地提出了地面试验存在小扰动情况下的点火逻辑问题。
Through ground test and hypersonic flow research, he made great progress in air-breathing hypersonic technology.
On the basis of the fault simulation for a liquid rocket engine and the statistical analysis for fire-test data in ground test, the major and important failure modes of the engine are summarized.
The paper presents the composition, functions, technical performance and research of the solid rocket ramjet engine ground test equipment and measurement control system in detail.
In addition, still checked other helminth in ground test piece egg.
During the ground test under different working conditions of the gas generator, the influences of the radial clearance and exhaust nozzle area were studied.
To meet the needs of certain type of aircraft avionic system ground test, a set of air data computer stimulating system was designed.