breakdown time信息详情

breakdown time发音

意思翻译

停工时间;[电子]击穿时间;破坏时期

相似词语短语

breakdown express───故障快车

breakdown song───崩溃之歌

breakdown lyrics───分解歌词

breakdown movie───崩溃电影

communication breakdown───通讯故障;沟通失败

commercial breakdown───商业细分

breakdown cover───故障保险

breakdown train───救援列车

diaphoresis breakdown───发汗破裂

双语使用场景

The anti-breakdown time of the filter dipped in the molten ductile iron was prolonged.───烧结的过滤器在液态球墨铸铁中浸泡,抗损坏时间延长。

The discharge breakdown time, peak current as a function of charge voltage and buffer gas are obtained.───得到了放电击穿时间、放电峰值电流随充电电压、不同气体介质变化的曲线;

Provide the troubleshooting support of all utility systems to reduce the breakdown time.───为公共设施的应急维护提供技术支持,减少故障停机时间。

However, with increasing the pulse energy, when a threshold was achieved, the breakdown time became saturation.───随着入射能量的增加,并超过某阈值时,击穿时间将达到饱和。

Provide the technical support of automation control for the troubleshooting of utility system to reduce the breakdown time.───为公共设施的应急维护提供自动化控制方面的技术支持,减少故障停机时间;

Provide the support for the troubleshooting of utility systems to reduce the breakdown time.───为公共设施的应急维护提供技术支持,减少故障停机时间。

In the case of 81kV aging test, coating breakdown time greater than 120min.───在电压为81kV的耐受试验条件下,沿面击穿时间大于120min;

Analysis of Breakdown Time Delay Under Impulse Voltage───脉冲电压下击穿时延分析

英语使用场景

Furthermore, it's found that the breakdown time is random. "

Whereas earlier sowing could result in the increase of dough breakdown time , softening and evaluation value , as well as head number and plot yield.

The values of breakdown time delay at the fields opposing is considerably larger than that at the other two modes of electrical field.

The breakdown time delay and jitter are very important for the plasma - electrode Pockels electro - optic switch - pulse process.

The breakdown time delay and jitter are very important for the plasma-electrode Pockels cells(PEPC) electro-optic switch driven by one-pulse process.

The arithmetic product of the breakdown time and the breakdown intensity is fixed with small pulse energy.

The discharge breakdown time, peak current as a function of charge voltage and buffer gas are obtained.

In the case of 81kV aging test, coating breakdown time greater than 120min.

A method for determining the breakdown time of the air was proposed, and further to determine the quantitative relation of the breakdown time and the breakdown intensity.