headwork信息详情
n.劳心的工作;脑力劳动
beadwork───n.珠饰细工;小珠装饰的物品
deadwork───n.(挖到矿物之前所做的)无益之工
headword───n.中心词,标题字;词目
leadwork───n.铅制品
headworker───n.脑力劳动者;劳心者
headwords───n.中心词,标题字;词目
leadworks───n.铅制品
handwork───n.手工艺,手工
headlock───n.摔跤中的夹头
This was accomplished by separating the project into two main parts; the headwork and the irrigation system.───这个工程主要有主体挡水和灌溉两部分。
in service for 123 years, the Lingong canal was replaced in 1967 by this canal headwork in front of us.───林公渠在服务了一百二十三年之后,1967年就被我们眼前的渠首枢纽工程所取代了。
The Kashi River canal headwork was built on the basis of the Lingong canal.───喀什河渠首枢纽工程是在林公渠的基础上建造起来的。
The Kashi River canal headwork was built on the basis of the Lingong Canal.───喀什河渠首枢纽工程是在林公渠的基础上建造起来的。
there is a unique aspect with the canal headwork.───这渠首枢纽工程还有一个独特之处呢。
Having been in service for 123 years, the Lingong Canal was replaced in 1967 by this canal headwork in front of us.───林公渠在服务了一百二十三年之后,一九六七年就被我们眼前的渠首枢纽工程所取代了。
Application of the "Bank with Cluster Fences" in the Project of Adding Gates for the Headwork of Baoji Irrigation Canals───“堤岸防护裙台”在宝鸡峡渠首加坝加闸水利水电工程中的应用
Quantitative Analysis of Bottom Sand Flow Failed to Measure in the Test of Water and Sand at Headwork of Yellow River Diversion───引黄渠首工程水沙测验中漏测底沙的定量分析
High Pressure Jet Grouting Construction of the First Stage Longitudinal Cofferdam for Headwork of Manshuiwan Water Diversion Project───漫水湾引水枢纽渠首工程一期纵向围堰高喷施工