bored piles信息详情
螺旋桩(boredpile的复数形式)
螺旋钻孔桩
填充桩
piles───n.(Piles)人名;(西)皮莱斯;n.痔疮;痔
bored───adj.无聊的;无趣的;烦人的;v.使厌烦(bore的过去式);烦扰
bored into───钻孔
notice bored───通知无聊
piles grow───成堆的生长
piles of───成堆的;一大团;一大批
belled piles───钟形桩
is bored───感到厌烦
get bored───感到厌烦;感到无聊
This paper introduces the design treatment of karst caves at the location of bored piles at karst district.───本文就岩溶地区钻孔灌注桩处在溶洞处的设计处理作一介绍。
slurry has direct impact on the bearing capacity and skin friction of bored piles.───泥浆性能直接影响钻孔桩的承载力和桩侧摩阻力。
According to the depth of the circumstances of the excavation, the bored piles and soil anchor-bar are adopted.───根据周边环境的情况和开挖的深度,采用了钻孔灌注桩和土钉锚杆相结合的支护形式。
The article introduces construction craft of bored piles and proposes the quality control method.───文章介绍钻孔灌注桩施工工艺,提出质量控制方法。
Bored piles at B5 bid main navigable hole of Shanghai Yangtze River Tunnel Bridge have variable section with large diameter and length.───上海长江隧桥B5标主通航孔变截面钻孔桩直径大,桩长长,质量控制困难。
The application effect of the high pressure bored piles is discussed in detail.───以大型工业厂房基础工程为例,详细分析了钻孔压浆桩的应用效果。
This paper can provide guidance for the secondary cleaning of boreholes of cast insitu soft bored piles in soft subsoil in the future.───对软土地基等多种地质条件下采用换浆法进行二次清孔的钻孔灌注桩的施工具有一定的指导意义。
Execution of special geotechnical work. Bored piles.───专业土工工程的执行.边桩
Based on the in-situ test data of bored piles, the mechanism of axial load transfer was analyzed.───通过桩基静载试验实测数据,分析了桩身轴力的荷载传递机理。
The post-grouting technique for bored piles can increase the vertical bearing capacity of piles, decrease the subsidence and improve the engineering behaviors of piles.
In this article, the construction technique of bored piles on the riprap layer geology in the breakwater is introduced and it also discusses how to solve the difficulties in the construction.
Based on real-time stress monitoring data for super-long large-diameter bored piles, the influences of post-grouting at the end of piles on bearing characteristics of foundation piles were analyzed.
Post-grouting is an effective technique to overcome the defects of settlement of debris on the bottom and shaft side mud cakes when slurry is used in boring for bored piles.
- bored pile site constraints
- bored pipe
- copper roll
- discussion board thread
- bored to death
- burned in
- akko
- discussion boards
- bank issue
- cross-linking agent
- discussion forums
- do not mind others
- bank jatim
- binding mode
- bank issued credit card
- copper rose
- chaukokfung
- approcia
- active desktop calendar
- beat drift
- appropriacy