groundwater modeling信息详情
地下水模型,地下水流模型
modeling amplifier───模拟放大器
modeling agencies───模特儿代理
brackish groundwater───微咸水
computer modeling───计算机模拟;计算机建模;计算机模拟技术;[医]计算机模型设计
simulation modeling───仿真建模;模拟建模
modeling psychology───造型心理学
modeling chocolate───巧克力造型
spreadsheet modeling───电子表格建模;试算表建模
dynamic modeling───[计]动态模型化,动态造型,动态建模
design thought of groundwater modeling information system software (CCRI-GWMIS1.0) was introduced.───介绍了地下水模拟信息系统软件(ccri—gwmis1.0)设计思路。
of groundwater modeling relies largely on the accurate estimation of hydrogeological parameters, which are often influenced by the choice of optimization methods used.───水文地质参数寻优结果的好坏会直接影响到地下水数值模拟的精度,而参数寻优结果很大程度上取决于寻优方法的选择。
we discuss the tendency of development in groundwater modeling.───探讨了今后地下水模拟的发展趋向。
Issues of Groundwater Modeling for the Middle Reach Basin of the Heihe River───黑河中游盆地地下水流建模的若干问题
- groundwater level
- groundwater movement
- groundwater mound
- groundwater motion
- groundwater mapping
- groundwater lens
- groundwater origin
- groundwater occurrence
- groundwater outflow
- groundwater pollution
- groundwater plane
- groundwater prospecting
- groundwater pollutant
- groundwater protection
- groundwater pressure
- groundwater recession
- groundwater mass
- groundwater potential
- groundwater regression
- groundwater right
- groundwater ridge