frame work信息详情
框架;结构
frame───adj.有木架的;有构架的;n.框架;结构;眼镜框;[电影]画面;n.(Frame)人名;(英)弗雷姆;vi.有成功希望;vt.给(图画或照片)配框;设计;建造;陷害;使…适合;制订;拟订
picture frame───画框,相框; 图框; 镜框;相框;画框
hinged frame───铰接框;铰练式枪身
freeze frame───定格;冻结帧;凝镜;停帧; 停格; 冻结帧; 凝镜
steel frame───钢架,钢框格;钢架;钢骨架
port frame───左舷框架
frame skip───跳帧
frame house───n.木屋
skylight frame───天窗架
analyzes what causes the crack and calculates according to the elastic ground frame work.───裂缝的原因进行分析并按弹性地基框架进行计算。
They can handle the prediction, filtering and smoothing problems in a unified frame work, and have asymptotic stability.───它们可统一处理,滤波,平滑和预报问题,且具有渐近稳定性。
It may be a frame work by other bidders.───它可能是由其他投标人的工作范围。
Exposed frame supported glass curtain wall is glass curtain whose metal frame work components are exposed outside the surface.───明框玻璃幕墙是金属框架构件显露在外表面的玻璃幕墙。
It also explains principles, frame work roles and perfectible steps int he establishment of the system.───并说明了建立的原则、框架、作用及完善步骤。
INTRODUCTION : The red ball is considered as celestial body and its geometric frame work is thought as space on physics.───作品简介:红色的球体可以被看作是天体,几何形的边框结构,可以理解为宇宙空间物理学上的阐释。
Framework e. G. The frame work of the project has been submitted to the president.───项目的框架已递交总裁审阅。
LIFTS AND SERVICE LIFTS. RULES FOR THE DESIGN OF THE METAL FRAME WORK BEARING EITHER THE HOIST OR THE GUIDE PULLEYS.───载客电梯和货物电梯.传动机构带滑轮或铰盘的金属构架的计算规则
Li Zhixin turned entire plant, check arrived to abandon angle iron frame work only, this became the frame of rust remover.───李志新转遍了全厂,检到了一只废角铁架子,这就成了除锈机的机架。
Under the frame work of Eco-epidemiology, we analyzed ecology factors such as habitats of JEs host and vector, and discuss possible environment factors that affect the spatial distribution of JE.
It is hardly to reconcile these works in one frame work and clarify how the internal mechanism determines the behaviors of the agents and manufacturers who are in foreign trade agency relationships.
But despite the agreement permanent legal frame work nothing has been done so far.
The doors opened up to a mess of more wrapped, framed works scattered everywhere.
This paper is in hope of providing a frame work of its theory and practice, relating to the cause, the feature of our practice and the future development of Quasi-municipal Bond.
We very much hope that a frame work strategy will be adopted about a whole European question which is the integration of the Roma's.
The frame work is made up of steel water pipe and rebar.
The BOTT of Frame work plane is used as the termination face for the vertical legs of the frame.
It also explains principles, frame work roles and perfectible steps int he establishment of the system.