day tank信息详情
日量熔槽;日用油箱;日常供应罐
tank───n.(尤指液体或气体的)大容器;坦克;水槽;池塘;<印度,澳>蓄水池;<美,非正式>牢房;vi.乘坦克行进;给车加油;喝醉;<美,非正式>遭受失败(尤指财政巨大损失);vt.把……贮放在柜内;打败;<北美,非正式>故意输掉(体育比赛);<非正式,苏格兰>使惨败;n.(Tank)(德、土、阿塞、土库、挪))汤克(人名)
glass tank───玻璃熔炉,玻璃桶
waste tank───废物槽;废料箱;漏水箱,废物槽
acetylene tank───乙炔发生筒
drop tank───副油箱;可抛油箱;可投放油箱
so tank───so油箱
master tank───[医]主桶
tank stars───坦克之星
gecko tank───壁虎坦克
It mainly controls the transfer of the chemical from the Drum Container to the Day Tank .───主要控制将化工试剂从桶形容器移至日箱的过程。
The gas stagnating in the Supply Filter is vented to the Day Tank for the set time.───在规定时间滞留在供给过滤器中的气体排放到日箱中。
It mainly controls the dilution of original chemical and the transfer to the Day Tank.───主要控制将原化学试剂稀释并移入日箱的过程。
The level of the Day Tank is lower than "C" , and the Drum Container starts the "Transfer" step.───日箱中试剂的量降至“C”,则桶形容器开始转移步骤。
The Dilution Tank waits the demand signal from the Day Tank .───稀释箱等待从日箱发出的请求。
The Drum Container waits the demand from the Day Tank .───桶形容器等待从日箱发出的请求。
The chemical is transferred from the Drum Container to the Day Tank until the Drum Container becomes empty and the level switch on the Air Separator turns OFF.
- departmental system
- destructive movement
- degree of preorientation
- decomposition bath
- cyclonic front
- damping test
- destructive operation
- day temperature
- decomposition by radiation
- degree of probability
- damping time
- departmental variance
- cyclonic motion
- destructive oxidation
- damping torque
- day the
- decomposition catalyst
- degree of protection
- departmentalise
- damping turn
- cyclonic precipitation