construction time信息详情

construction time发音

意思翻译

施工期

相似词语短语

construction───n.建设;建筑物;解释;造句

ziv construction───ziv结构

cymar construction───聚伞花序结构

calamar construction───卡拉马建筑

participial construction───分词结构

adams construction───adams结构

bulkhead construction───舱壁结构

ridgepole construction───脊杆结构

fluor construction───福陆建筑

双语使用场景

This reduces the construction time and nuisances for the neighborhood (noices, dust, etc…).───这减少了施工时间和对于邻居的噪音、灰尘等干扰。

We should work according to the overall schedule chart (the construction time schedule) of the project.───我们应该根据工程项目标总进度表(构筑进度表)工作。

time was slashed from 540 to 390 calendar days.───时间是从540天削减至390天。

These included skills shortages, reduced construction time, increased productivity, reduced construction waste, and poor working conditions.───这些问题包括技能短缺,降低建设时间,增加生产力,降低建设施工浪费,以及糟糕恶劣的工作条件。

Method forwards to any service provider that was given to the design surface manager at construction time.───方法将转发至在构造时给予设计图面管理器的任何服务提供程序。

Engineer Bob Gordon of the Mace Group estimates that the technique will save seven months of construction time.───梅斯集团的工程师鲍勃·戈登预计该技术会节省七个月的工期。

Reduction of construction time: Make construction less complex by the pre-manufactured main and branched cables.───缩短工期:主干电缆和分支电缆已经在工厂预制,现场施工简便。

Another possibility is to use simple on-site fabrication facilities to aid quality assurance and to reduce construction time.───另一种可能性是使用简单的现场装配组件制造设备,保证质量并且降低施工时间。

The main building of the plant employed steel structure of advanced design, giving smaller building volume and shorter construction time.───主厂房采用了国内先进的钢结构,建筑体积小,建设周期短;

英语使用场景

We should work according to the overall schedule chart ( the construction time schedule ) of the project.

Total construction time was about 200 hours including installation of the movement and assembly of the various parts.

Economic efficiency: internal rate of return is 16% with 8. 5-year payback period (incl. construction time).

The object of claim for extension of time is to extend the construction time, to avoid the penalty for delay, and then provide the contract foundation for legality of financial claim.

The skills of our project managers have shortened construction time by 12 weeks compared with five years ago.

Concrete-filled thin-walled square steel tubes are becoming more and more attractive to be used in engineering practice, for reasons of saving construction time and costs.

As a result of observation data analysis, we were succeeded in controlling the residual settlement by adjusting the construction time of concrete pavement.