construction progress信息详情
施工进度
progress───vi.前进,进步;进行;n.进步,发展;前进;n.(Progress)人名;(赞)普罗格雷斯
construction───n.建设;建筑物;解释;造句
significant progress───显著进展;重大进展
industrial progress───[工经]工业进展;[工经]工业进步
technological progress───技术进步
progress indicator───进程指示器
rapid progress───快速的进展;飞速的发展;[医]快速进展
in progress───进行中; 半路;正在进行;在发展中
no progress───没有进展;没有进步;没有长进
roadbed construction methods together directly related to the construction progress and quality of the project.───路基的施工方法选择直接关系到施工进度和工程质量。
Companies provide labor in this project. According to the safety and guarantee the construction progress Arrange labor.───本工程所需劳动力均由公司提供。根据安全和保证施工进度安排劳动力投入。
Saving hours of 50% — 70%, greatly accelerate the construction progress, shorten the construction period.───可节约工时50%——70%,大大加快施工进度,缩短施工周期。
We hope that there is no more change to the inspection procedures to avoid any delay of the construction progress.───我们希望验收程序不要再有什么变化以免延误施工进度。
Meanwhile, put a double team and equipment, 24 hours of continuous construction, drilling two ways to speed up the construction progress.───同时,投入双倍的队伍和设备,24小时连续施工,采取两头钻进的办法加快施工进度。
Work, and to ensure that generally do not occur during the construction impede construction progress and quality of fault.───工作,并保证在施工期间一般不发生有碍施工进度和质量的故障。
The utility model can considerably reduce present construction capacity as well as improve present construction progress.───本实用新型可大大减少了现场的施工量,提高了现场施工的进度。
Check up mechanical material& equipment to be site& check up monthly quantity of construction progress.───检查工地材料机械设备,核对月进度工程量。
Because its working condition is bad, presents like on the breakdown frequently in the use, serious influence project construction progress.───由于其工作条件恶劣,在使用中经常出现如上故障,严重影响了工程施工进度。
The construction progress payment shall be paid in accordance with 75% of the stated account in the interim payment certificate .
When work is started, the project manager submits a Construction Progress Form on which the schedule for materials procurement and phase-based acceptance is based.
Party A shall submit monthly report of construction progress on the 25th of each month; Party A must pay for the audited progress payment of 95% within 5 days.
Construction progress chart compiled with flow process without steps is difficult to show the critical path.
In addition, comprehensive comments of bridge construction progress calculation, implement and tolerance analysis has been done.
That Party A don't pay advance payment, progress payment and price difference in purchased materials via procurement agent as per contractual specifications influences construction progress.
At the same time, the crane operation efficiency is also a chief reason to effluence on construction progress.
The application of steam curing process for precast segmental beams of Humin Elevated Project has increased the early strength of concrete and met the requirements of construction progress.
- contraction fatigue
- congas
- counterweighted lid
- cyanilike
- cool it down coterie
- contraction fault
- construction project manager
- counterweighted lift
- curatorial studies
- construction projects
- contraction field
- cool it down to
- congealing temperature
- curatorious
- construction schedule
- cyanine
- congealing words
- contraction figure
- cool items
- counterwoman
- construction scheme