construction cost信息详情
[建]建造成本;工程费
construction───n.建设;建筑物;解释;造句
ziv construction───ziv结构
cymar construction───聚伞花序结构
cost───n.(Cost)(美、英、罗、巴、法、荷)科斯特(人名);v.成本为……;花费;使付出;使花许多钱(非正式);给……估价;n.费用,代价,成本;损失;诉讼费用
calamar construction───卡拉马建筑
participial construction───分词结构
adams construction───adams结构
bulkhead construction───舱壁结构
ridgepole construction───脊杆结构
These were achieved to minimizing the wall/door construction cost.───这么做可以使墙壁/门的建筑费用最小化。
To prepare all of financial statement relevant to construction cost and investment.───编报有关基建投资成本等各类报表。
The construction cost was over budget.───施工费用超过了预算。
It is usually seems to be a contradiction to green architecture and construction cost.───发展绿色建筑与节约建设成本通常被人们认为是一对矛盾。
Construction of convenience: easy to install and maintain, with tiles the same installation procedures, construction cost and time savings.───施工方便:方便安装和维护,同瓷砖一样的安装工序,节约施工成本和时间。
Easy to use, good construction property, construction tools available direct water cleaning, reducing the construction cost.───使用方便,施工性能好,施工工具可用水直接清洗,降低施工成本。
The project construction cost control administration of highway engineering construction is an important part of the scientific management.───工程造价控制管理是公路工程建设科学管理的重要组成部分。
According to the current construction cost data, with specific internal revenue rate, the wind power price was calculated.───基于现有的输变电工程以及风电场造价数据,本文通过固定收益率反算出风电电价。
The quota design is one of important methods in enhancing the engineering design quality and controlling engineering construction cost.───限额设计是工程设计人员控制工程造价、提高设计质量的重要手段之一。
Scope: Construction cost of labor insurance collection . Construction cost collection.
Managing contractor cares about construction cost as well as owner's investment cost.
The key measures to the control of construction cost in foundational construction in high school include choosing the optimum design project, guaranteeing the quality of design.
Determining depreciation is based on the construction cost, value, the liquidation costs and depreciable lives.
The maximal flow—minimal cut theory was explained in the paper. A period of construction—cost optimization about a factual project was analysed.
It lowers down the construction cost and saves the building cost.
A final construction cost has yet to be set and negotiations with the contractor are still continuing.
How to cut TBM construction cost is the key to the popularization of the TBM construction method, and optimizing the TBM labour organization is of great importance to the cost reduction.
The actual construction cost payout is controlled by contract construction cost budget norm or enterprise practicality consumption norm . Relationshi...
- cool dream
- cuprous sulfite
- contract time
- counterpointing
- cy carter
- construction costs
- confuse with a and b
- cool drift
- cuprous sulfocyanide
- contract type
- cy cy
- construction crane
- counterpointresearch
- confuse with affect
- cool driver
- cuprous sulphate
- contract unit
- construction deficiency
- counterpoints
- cy e
- confused about movies