concrete pouring信息详情
混凝土浇注
pouring───v.倾泻;倾诉(pour的ing形式);n.[冶]浇注;传布
concrete───adj.混凝土的;实在的,具体的;有形的;n.具体物;凝结物;vi.凝结;vt.使凝固;用混凝土修筑
pouring lean───倾斜浇注
pouring upon───倾盆大雨
pouring down───(雨)倾盆而下
pouring rain───瓢泼大雨;倾盆大雨
prestressed concrete───(美)预应力钢筋混凝土
concrete noun───n.具体名词
pilasters concrete───壁柱混凝土
This paper introduces the concrete pouring of continuous box girder of main structure of the bridge and the tension construction technology.───介绍了该桥的主桥上连续箱梁混凝土浇筑以及张拉施工技术。
platform shall be built for concrete pouring. Workers and machines shall all stand on the platform, not allowed to tread the rebars.───混凝土浇筑时搭设操作平台,施工人员及机具放在平台上,不得踩踏钢筋。
computing model is optimized according to the model board trolley installation form and the concrete pouring process.───根据现场测量时模板台车的结构安装形式和混凝土浇注的施工步骤,反复修整完善计算模型。
Working platform shall be built for concrete pouring. Workers and machines shall all stand on the platform, not allowed to tread the rebars.───混凝土浇筑时搭设操作平台,施工人员及机具放在平台上,不得踩踏钢筋。
End of concrete pouring, measuring instruments should be regularly inspected, maintained and stored indoors to avoid damage.───浇完混凝土后,计量器具应定期检查、维修,存放在室内,以免损坏。
This paper mainly introduces the usual accidents in underwater concrete pouring and its countermeasures.───本文着重介绍水下混凝土灌注施工中的常见事故及相应的处理措施。
Author points out that in project the concrete pouring; anti-corrosion, waterproof and jacking of steel culvert box are the key points.───指出在以工期为主导的工程中,钢涵箱的防腐、防水、顶进、混凝土浇筑是施工中的重点。
Test results has a forecasting and guiding role of theory to the problems on concrete pouring process of the main arch ring.───根据实测结果,对混凝土主拱圈浇筑过程中可能出现的问题具有预测和理论指导作用。
China's concrete-pouring fiscal stimulus is unlikely to help.───以基本建设为主体的中国财政刺激方案,不太可能起到帮助作用。
In addition, the anchoring backing board can also be fixed on the construction mould board, and the position offset of the anchoring plate can be prevented during concrete pouring.
Concrete moldboard is an important facility on the concrete pouring.
In this paper the arithmetic of 2D column drawing and 3D perspective drawing of the concrete pouring for arch dam is studied, and the concrete pouting is simulated by computer.
Covered in concrete pouring water conservation should be carried out after the 12 H.
- container car
- coordination polymerism
- curtain nozzle
- control variable method
- crimsonland
- connatre ru
- crystal cell
- container cargo
- coordination polymerization
- cortrosyn
- covenant school
- concrete procedure
- curtain of fire
- control variable modified
- connatural
- crimsonsea
- crystal checker
- coordination principle
- corundellite
- covenant university
- curtain of night