completion time信息详情

completion time发音

意思翻译

完成时间

相似词语短语

completion───n.完成,结束;实现,竣工

dialogue completion───完成对话;补全对话

successful completion───成功完成

completion dates───竣工日期;[工经]完工日期

completion status───[计]完成状态

certificate of completion───完工证明;竣工证明书;[经] 竣工证书,竣工证明;结业证书

time time time───时间

years away from completion───离完工还有几年

time───vt.计时;测定…的时间;安排…的速度;n.(Time)人名;(俄)季梅;(英)泰姆;(罗)蒂梅;adj.定时的;定期的;分期的;n.时间;时代;次数;节拍;倍数

双语使用场景

completion time of the execution cycle determines how fast data is processed.───执行周期的完成时问决定了数据处理速度的快漫。

Each ARM event reported to the DCI contains information about the start time and completion time of the ARM transaction, in addition to metadata.───每个报告给DCI的事件都包含ARM事务启动和完成时间的信息,这些信息添加到元数据中。

Estimated Completion Time: 60-90 minutes.───预计完成时间:60 - 90分钟。

This paper considers the problem of scheduling n jobs on m parallel unbounded batch machines to minimize the total weighted completion time.───考虑无界批量机器并行调度中极小化加权完工时间和问题。

Firstly, a formula was derived to determine completion time of a batch, which was produced continuously on production line.───给出了产品在生产线上连续加工时产品批量的完工时间计算公式,并证明了该公式的正确性。

The objectives of GA were to achieve shortest completion time, lowest costs and best credit so as to simplify the model.───为简化模型,以最短的完工时间、最低的成本和最高的信誉度为目标。

We considered the scheduling problem with the objective of minimizing the discounted total weighted completion time.───本文讨论了目标函数为折扣加权总完工时间的调度问题。

The improvement method for reduction of queue length was presented with emphasis on reducing the fluctuation of task completion time.───重点在减小任务完成时间的波动等方面,给出了减小队列长度的改进方法。

Different designs reflect different risk control strategies for completion time overruns.───不同的设计反映了不同的完成时间超支的风险控制策略。

英语使用场景

Thirdly, it analyses prediction technology in scheduling, and proposes prediction model to predict task expected completion time using subtasks with maximum mathematical expectation.

A quantitative value representing the subjective rating or opinion of users reacting to seeing or using a system, as opposed to performance measures like task completion time or number of errors.

The objective is to determine the optimal due-date and schedule simultaneously to minimize the completion time, earliness and tardiness penalties.

The computing model result in the separation of the influence of machine utilization, sequential job service rate, and parallel task allocation to the parallel task completion time.

A dynamic task allocation mechanism is presented which reduces communication traffic and resolves the problem of task deadlock on the basis of shortening task completion time.

Based on the set-cover problem, we proved that the problem of minimize completion time for AND/OR precedence constraint tasks is NP-complete.

In these two problems, the job processing time is a linear decreasing function of its starting time, the objective is to minimize the total completion time.