change control信息详情

change control发音

意思翻译

变更控制

相似词语短语

control───v.指挥; 控制; 限定; 限制; 阻止蔓延; 抑制;n.统治; 控制(力); 克制; 管理; 限制; 控制按钮; 检查站/人员; 对照标准;n.控制;管理;抑制;操纵装置;vt.控制;管理;抑制

change───v.改变,转变,(使)不同;(使)变换;替代,更换;交换;货币兑换;将……换成零钱;退还;n.变化,改变;替代物;换洗衣物;零钱,硬币;换乘;全新体验;新月相的出现

change off───<美>换班,交替;轮流

hyaline change───玻璃样变

never change───永远不改变;永不改变(歌名,NeverChange)

managing change───管理变更

unchangeable change───不变的变化

your change───找你的零钱

cambelt change───形成带变化

双语使用场景

Change Control Process - annual.───管理权限改变流程—每年。

Requirements need change control, too.───需求也需要控制变更。

Backup is a critical change control function.───备份是一项关键的更改控制功能。

A prerequisite to any change control process is an up to date inventory of hardware and software.───任何更改控制流程的先决条件都需要有最新的硬件和软件库存。

At this point, the PM needs to tighten up the change control or risk failing to deliver on the team's commitments.───此时,项目经理需要绷紧变更控制或者无法按要求交付的风险。

For contractual relationships with users, it may be necessary to institute strict change control procedures early in Construction.───对于同用户的契约关系来说,在构建中较早地制定严格的变更控制程序也许是必须的。

Any such change following the Effective Date must be processed and implemented by the application of the agreed change control procedures.───任何如此变动跟随有效日期必须由同意的变动控制程序的应用处理和实施。

But while change control does need to be a strict process that treats the project baseline as holy, it does not need to be inflexible.───但是变更控制并不需要严格到把项目基准神圣到不可侵犯的程度,弹性是必要的。

Be aware that the concept of change control, and keeping a change log, is generally broader than the troubleshooting arena.───请注意,更改控制的概念,以及保存更改日志,通常比故障诊断所涉及的领域更加广泛。

英语使用场景

The change control tool sets the issue's initial status to Submitted.

Influencing the factors that circumvent integrated change control so that only approved changes are implemented.

Configuration control boards are also known as change control boards.

Overall Change Control—coordinating changes across the entire project.

A . No change control boarD . B.

Influencing the factors that could circumvent integrated change control so only approved changes are implemented.

Control change and variations through formal change control process.

Configuration management with change control includes identifying, documenting, and controlling changes to the baseline.

Similarly, Change Control requirements should be defined in the commercial contract for supply of API Starting Materials.