water pump house信息详情
水泵房
water pump───抽水机,水泵
circulating water pump───[机]循环水泵
submerged water pump───潜水泵
water cart pump───水车泵
dingy water pump───污水泵
pump───v.抽吸;喷出;注入;射向目标;打气;(非正式)盘问;剧烈上下晃动;让……使用大量药物;洗胃;增加数值;n.(Pump)(美、俄、印、泰、加)蓬普(人名);n.泵;泵送;无带浅帮女鞋;平底轻便鞋
abdominothoracic pump───腹胸泵
proportioning pump───配比泵,比例泵;[化工]配比泵;计量泵
vacuum pump───n.真空汞,蒸汽吸水机; 真空泵
This paper introduces the reason and plan of improving rotating filter screen in circulating water pump house in Douhe Power Plant, and the operation result after improvement.───介绍了陡河发电厂循环水泵房旋转滤网改造的原因、方案以及实施改造后的运行效果。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.───对华能玉环电厂1 000 MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
pump house sink well is designed and down sink construction technology are introduced in this paper.───泵房基坑施工 ,因变更设计和追求进度造成支护崩塌事故 ,全文简述事故经过和处理方法。
Low voltage auxiliary transformer for circulating water pump house and general service water system .───循环水泵房和工业水泵房系统的低压厂用变压器。
Domestic Fabrication Technology of Steel Structure for Water Pump House of Ling Ao Nuclear Power Station───岭澳核电站水泵房钢结构国产化加工技术
Inquisition into Retrofitting Method for Strength Reinforcement of Water Pump House Structure───水泵房结构强度加固改造方法的探讨
Retaining Technology for Deep Foundation Pit Excavationof Circulating Water Pump House in Zhuhai Power Station───珠海电厂循环水泵房深基坑支护技术
Hydraulic Characteristic Test Research on Inlet Conduit for Circulating Water Pump House of Tuoketou Power Plant───托克托电厂循环水泵房进水流道水力特性试验研究
Structure Design of Circulating Water Pump-house on Silt Foundation at Riverside───江边淤泥地基循环水泵房结构设计方法
The circulating water pump house of blast furnace is the important accessorial facilities.
This paper introduces the reason and plan of improving rotating filter screen in circulating water pump house in Douhe Power Plant, and the operation result after improvement.
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
- transitional stride
- transitional stall
- what smells good
- the most beautiful encounter
- the most beautiful
- yi ru
- support density
- untrusted
- water pump housing
- story tellers
- yi ru geletu
- take the following action
- the most beautiful g
- water pump kit
- what smells terrible
- untrusted system file
- spring washer splited
- story telling
- support department
- test location
- twinned electrode